From Container to Walls – continued…
A sandblast session with the wall sections ensures proper adhesion between steel and two-part epoxy coatings…
A sandblast session with the wall sections ensures proper adhesion between steel and two-part epoxy coatings…
For the ALPAR project – we tried to come up with a way of integrating as much re-used material as possible for the concrete plazas. We happened to come across a batch of decommissioned dough pans from Domino’s Pizza. On three separate occasions – we poured batches of LEED 8 …
Here we are in the process of fabricating the stiffening and support / anchoring structure that will be behind the wall and below grade. Central Recycling Services donated all of the pipe needed for creating the structure.
We recently began the prefabrication of retaining wall sections that will be used for the ALPAR project at the NW corner of Westchester Lagoon in Anchorage. Horizon Lines donated a retired shipping container to the project and we have begun the process of transforming it into a series of walls. …